The Project
Food Technology Block and Internal Remodelling
Project Value
£423,688
The access road and car parking areas at this school were originally a combination of concrete and loose stone. As part of this project these areas were removed and resurfaced with tarmac. At the main entrance to the site new brick piers and entrance gates were installed along with CCTV cameras and an intercom system linked to the school reception.
Site security has been greatly enhanced and the new gates and access road contribute to a much better first impression of the school for those entering the site.